Service area · Clallam County, WA
Hardwood floors in Sequim
The rain shadow changes the arithmetic. Seventeen inches of rain a year makes Sequim the driest place in western Washington — and it means floors here gap in winter rather than cup in summer.
Image slot · loc-sequim · 1600×2000 · Hard maple after a recoat, valley light — SunLand
- Drive time
- 55 min via SR-20 and US-101
- Housing stock
- Mostly 1990s–2010s single-level builds
- Common floors
- Prefinished and engineered oak, hard maple
- Typical project
- 900–1,800 sq ft, often a recoat
Sequim’s floors are younger than the rest of the peninsula’s, because most of Sequim’s houses are. Two decades of retirement and valley-floor building left a town full of single-level homes with prefinished oak and engineered floors laid between roughly 1995 and 2015. That stock is the reason we do more screen and recoat work here than anywhere else we go.
Winter gapping, and why not to fill it
The Olympic rain shadow puts Sequim at around seventeen inches of annual rainfall — a third of what Port Angeles gets an hour west. Add a heat pump running through January and indoor relative humidity can fall into the twenties. Boards shrink, gaps open, and every year somebody fills them.
Do not. A gap that opens in January closes in July, and filler that went in at the driest moment of the year gets crushed or pushed proud when the boards come back. The fix is humidity, not putty: hold the house between 35 and 55% and most Sequim gapping simply stops being visible. We take readings on every visit and put the numbers in writing.
Prefinished bevels
A lot of the 1990s and 2000s floors here are prefinished with a micro-bevel at every edge. Those bevels collect grit, and they cannot survive a full sanding — flatten the floor and the bevels go, which changes the look of the room whether you wanted that or not. It is a real decision and we walk through it before quoting rather than after. Often the honest answer is a recoat and another eight years.
Engineered floors
Engineered board with a thin wear layer — 2mm or less, which is most of what was installed in the boom — has one sanding in it at best, and some have none. We measure the wear layer at a floor register or a threshold before saying anything about sanding. When there is nothing to sand, a recoat is not a compromise; it is the whole available strategy, and done every five years it will outlast the roof.
The valley, which is a different town
Out past Carlsborg and up the Dungeness there are farmhouses, barn conversions and outbuildings turned living space — fir, reclaimed stock, and floors laid by whoever owned the property at the time. Those are our favourite calls, and they are proper refinishing work.
Single-level houses are easy on everyone
No stairs means faster staging, cleaner containment and, for a recoat, genuinely one day. We batch Sequim recoats into single weeks; if your timing is flexible the lead time is usually short.
Services in Sequim
A Sequim project
Red oak, twenty years of pets and traffic, patched and refinished.
A 20-year-old red oak floor that sand, water, pets and traffic had beaten up. The old floor-heat registers were patched in with matching flooring, the whole floor sanded and finished at a low sheen. “Great low sheen finish — they look brand new!” — Jeanette Simecek, Google review, February 2022. [Confirm the town for this job before it stays on the Sequim page.]
Photography for this project is pending — the slot is marked case-sequim in the markup.
Image slot · case-sequim · 3000×1500 · Oak after refinish, low sheen
Next step
Before you pay for a sand, let us test the finish.
It takes ten minutes and a tablespoon of water. In Sequim the answer is a recoat more often than not, and we would rather tell you that than sell you a week of machinery.
We walk the floor, take moisture readings, and send a written scope with a fixed number. No pressure, no same-day discount.